Paper Code | Title | Authors | Topic |
---|
Th-M17-TO/1 | Design and implementation of manufacturing automation system through international standards | Cataldo Andrea, Carpanzano Emanuele, Donà Marco | 5.2 |
Th-M17-TO/2 | On-line job-shop scheduling of a manufacturing system based on a virtual supervisor concept | Baeyens Enrique, Trujillo Jesus, Pasek Zbigniew | 5.2 |
Th-M17-TO/3 | Planned Lead-times Design in Stochastic Multistage Assembly Systems | Song Dong-Ping, Hicks C., Earl C.F. | 5.2 |
Th-M17-TO/4 | Random Start and Forward Search Applied to Solve Multi-Criterion Planning Problems | Dang Thanh-Tung, Frankovič Baltazár, Sheahan Con, Budinská Ivana | 5.2 |
Th-M17-TO/5 | Noncooperative Game on Scheduling: The Single Machine Case | Wang Changjun, Xi Yugeng | 5.2 |
Th-M17-TO/6 | A logistic process scheduling problem: Genetic Algorithms or Ant Colony Optimization? | Silva Carlos, Sousa J.M., Runkler T., Sá da Costa J.M.G. | 5.2 |