Camacho, E. and Bordons Alba, C., (2013) Model Predictive Control. London: Springer London, Limited. Cassady, C. R., & Kutanoglu, E. (2005) ‘Integrating preventive maintenance planning and production scheduling for a single machine’, in IEEE Transactions on Reliability, pp. 304–309. Charitopoulos, V. M., Dua, V. and Papageorgiou, L. G. (2017) ‘Traveling salesman problem-based integration of planning, scheduling, and optimal control for continuous processes’, Industrial and Engineering Chemistry Research, 56(39), pp. 11186–11205. Charitopoulos, V. M., Papageorgiou, L. G. and Dua, V. (2019) ‘Closed-loop integration of planning, scheduling and multi-parametric nonlinear control’, Computers and Chemical Engineering, 122, pp. 172–192. Cheng, G. and Li, L. (2020) ‘Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems’, Reliability Engineering and System Safety. Elsevier Ltd, 204(January), p. 107146. Dias, L. S. and Ierapetritou, M. G. (2020) ‘Integration of planning, scheduling and control problems using data-driven feasibility analysis and surrogate models’, Computers and Chemical Engineering. Elsevier Ltd, 134. Grossmann, I. E. (2012) ‘Advances in mathematical programming models for enterprise-wide optimization’, Computers and Chemical Engineering. Elsevier Ltd, 47, pp. 2–18. Rafiei, M. and Ricardez-Sandoval, L. A. (2020) ‘New frontiers, challenges, and opportunities in integration of design and control for enterprise-wide sustainability’, Computers and Chemical Engineering. Elsevier Ltd, 132. Shafiee, M. and Chukova, S. (2013) ‘Maintenance models in warranty: A literature review’, European Journal of Operational Research. Elsevier B.V., 229(3), pp. 561–572. Zhuge, J. and Ierapetritou, M. G. (2015) ‘An Integrated Framework for Scheduling and Control Using Fast Model Predictive Control’, AIChE Journal, 59(4), pp. 215–228.